Tangshan City, one of the largest steel producing bases in China, issues
its Strict Control Measure Plan on Weather Pollution for March.
Steel Industry:
Sintering machines which passed ultra-low emission standard and met
Tangshan Emission Limitation (particulates from sintering machine head
and baked pellet, SO2, hydroxide 95% above respectively let out 5mg/m,
20mg/m and 30mg/m per hour) are asked to produce, while others which
can’t be shut down shall kept lowest operation.
Every county (City and District) is asked to announce its sintering
machines production plan in March to related departments.
Coking Industry:
Coking time is asked to prolong to 28 hours. |
(To contact the reporter on this story: molly.shi@steelhome.cn or 86-21-50585358) |