On April 3, 2019, the No.3 blast furnace project of HBIS Group Laoting Steel China, which was constructed by China MCC17 Group, officially started its construction.
It was learned that the blast furnace was 3,000 cubic meters, with the annual output of 2 million tonnes.
(To contact the reporter on this story: leo.ji@steelhome.cn or 86-555-2238932) |