I Steel Market Review and Trading Tips
Review
Most markets in East China have not completely recovered, and some
logistics enterprises and construction fields resumed production.
Market price inquiry increased and trading volume inclined.
Downstream demand gradually was improved. Specifically, construction
steel price fell by 70-130 yuan per ton; HRC/CRC price dropped by
20-200 yuan per ton, among which Shanghai HRC price fell at first
then rose with plain transaction. Medium plate price declined by
20-110 yuan per ton, except for increased price in Wuan market.
Section steel price dropped by 50-90 yuan per ton. Production status
of steel mills, market inventory and logistics should be
highlighted.
SteelHome predicts that steel price will continue to moderately
increase next week.
Forecast
At present, most steel mills in East China reduce or stop
production. Besides, downstream enterprises will gradually resume
production in this week. And transportation have not completely
recovered. Social inventory and inventory in steel mills will
continue to increase.
Trading Tips
Traders should stay calm and appropriately sell products to obtain
the fund back when the inventory is at a high level. Steel mills are
suggested to actively reduce the production.
Construction Steel Price in East China Market
Market |
Date |
Rebar(Φ20mm) |
Medium and Heavy Plate(20mm) |
HRC(5.75mm) |
CRC(1.0mm) |
Angle Steel(5#) |
Shanghai |
2020/2/21 |
3490 |
3600 |
3530 |
4160 |
3730 |
Change |
↓70 |
- |
↑20 |
↓110 |
↓50 |
Leading Steel Mill/Place of Production |
Shente Steel |
Pinggang |
Rizhao Steel |
Wugang |
TangshanCai |
Zhejiang Hangzhou |
2020/2/21 |
3550 |
3640 |
3570 |
4310 |
3990 |
Change |
- |
↓50 |
↓30 |
↓170 |
↓50 |
Leading Steel Mill/Place of Production |
Shagang |
Pinggang |
Shagang |
Wugang |
TangshanCai |
Jiangsu Nanjing |
2020/2/7 |
3500 |
3660 |
3560 |
4310 |
3970 |
Change |
↓80 |
↓30 |
↓190 |
↓110 |
- |
Leading Steel Mill/Place of Production |
Yonggang |
Pinggang |
Magang |
Wugang |
Anyang |
Anhui Hefei |
2020/2/21 |
3610 |
3620 |
3610 |
4300 |
3870 |
Change |
↓130 |
↓40 |
↓160 |
↓100 |
↓90 |
Leading Steel Mill/Place of Production |
Magang |
Pinggang |
Magang |
Magang |
TangshanCai |
Shandong Jinan |
2020/2/21 |
3440 |
3700 |
3480 |
4220 |
3770 |
Change |
↓110 |
↑20 |
↓50 |
↓90 |
↓50 |
Leading Steel Mill/Place of Production |
Yongfeng |
Tanggang |
China Rainway Group |
Hangang |
Huanghe Special Steel |
JiangXi Nanchang |
2020/2/21 |
3600 |
3730 |
3650 |
4290 |
4000 |
Change |
↓100 |
↓110 |
↓200 |
↓60 |
↓90 |
Leading Steel Mill/Place of Production |
Nanxin Ping |
Pinggang |
Xingang |
Xingang |
TangshanCai |
Fujian Fuzhou |
2020/2/21 |
3510 |
3880 |
3530 |
4190 |
3880 |
Change |
↓100 |
↓20 |
- |
↓140 |
↓90 |
Leading Steel Mill/Place of Production |
Sangang |
Sangang |
Bengang |
Bengang |
TangshanCai |
Average price |
2020/2/21 |
3528 |
3690 |
3561 |
4254 |
3887 |
Change |
↓84 |
↓32 |
↓87 |
↓111 |
↓60 |
II Trading Volume of Main Products in East China
Trading volume of construction steel and flat steel inclined.
SteelHome predicts that trading volume will slightly increase in
this week.
Trading Volume of Main Products in East China
(Unit: tonne)
Product |
Average price
(14-20, Feb) |
Change% |
Average price
(February) |
Change% |
Construction steel |
220 |
120 |
124.99 |
-99.52 |
Medium plate |
1522 |
1485.42 |
650.01 |
-90.07 |
HRC |
610 |
263.1 |
301.45 |
-93.97 |
III Price Change of Main Products in East China (Unit: yuan per
tonne)
Product |
Rebar (Shagang) |
Strip (Zenith Steel) |
Rebar (Magang) |
Rebar (Laiwu Steel Yongfeng Steel) |
Rebar (Nanjing Steel) |
Medium plate (Huawei) |
HRC (Rizhao Steel) |
Angle steel (Huanghe special Steel) |
Specification |
Φ16-25mm |
2.5mm*235 |
Φ16-25mm |
Φ18-22mm |
Φ16-25mm |
14-20mm |
4.75mm |
100*100 |
Change |
- |
↓300 |
↓80 |
↓80 |
↓130 |
↑20 |
↓70 |
↓60 |
Current Price |
3880 |
3650 |
3650 |
3420 |
3520 |
3610 |
3463 |
3800 |
Market Price |
3550 |
3670 |
3610 |
3440 |
3520 |
3620 |
3530 |
3770 |
Difference |
-330 |
20 |
-40 |
20 |
- |
10 |
-67 |
-30 |
Leading Market |
Hangzhou |
Jinan |
Hefei |
Nanjing |
Wuxi |
Shanghai |
Wuxi |
Leading Market |
Execution Date |
2020/2/21 |
2020/2/20 |
2020/2/21 |
2020/2/21 |
2020/2/21 |
2020/2/21 |
2020/2/18 |
2020/2/18 |
Note |
Ten-day Price |
Daily Price |
Daily Price |
Daily Price |
Daily Price |
Post-settlement |
Ten-day Price |
Listing Price |
Review |
Strip ex-work price of Zenith Steel declined by 300 yuan per
ton (ten-day price); Shagang ex-work price stabilized; daily
price fluctuated within 20-130 yuan per ton |
Forecast |
Daily price will increase in this week while ex-work price
(ten-day price) will decline. |
IV Inventory
Construction Steel
Review
Demand in East China market have not completely activated and the
transportation can not be totally recovered in short time.
Construction steel market inventory and inventory in steel mills
continued to greatly increase.
Forecast
Market inventory and inventory in steel mills will continue to
increase.
|
Shanghai |
Hangzhou |
Nanjing |
Jinan |
Hefei |
Nanchang |
Fuzhou |
Market |
Steel Mills in East China |
Wire Rod |
13.2 |
26.4 |
9.7 |
5.6 |
8.26 |
10.5 |
12.3 |
123.36 |
77.12 |
Change |
↑0.9 |
↑1.2 |
↑4.5 |
↑0.7 |
↑1.76 |
↑1.3 |
↑0.5 |
↑20.46 |
↑13 |
YoY |
↑7 |
↑10 |
↑6.5 |
↑2.4 |
↓2.24 |
↓0.8 |
↑2 |
↑48.66 |
- |
Rebar |
49.5 |
64.8 |
30.3 |
9.5 |
35.1 |
31.8 |
19 |
353.7 |
257.45 |
Change |
↑2.6 |
↑2.3 |
↑8.7 |
↑1.3 |
↑4.3 |
↑2.3 |
↑1 |
↑43.5 |
↑40.25 |
YoY |
↑12.5 |
↑4.1 |
↑5.2 |
↑3 |
↑25.5 |
↑8.8 |
↑5 |
↑135.25 |
- |
Flat Steel
Review
Market inventory and inventory in steel mills continued to increase
in East China market, especially HRC inventory.
Forecast
Market inventory and inventory in steel mills will continue to
increase as logistics enterprises gradually resume production.
|
Shanghai |
Hangzhou |
Nanjing |
Wuxi |
Jinan |
Quanzhou |
Steel Market |
Steel Mills in East China |
Medium and Heavy Plate |
17.2 |
7.5 |
4.55 |
8.5 |
2.13 |
3.5 |
69.47 |
22.28 |
Change |
↑2.1 |
↑1 |
↑0.65 |
↑1.4 |
↑0.23 |
↑0.6 |
↑9.54 |
↑5.65 |
YoY |
↑0.3 |
↑1.8 |
↓1.45 |
↑3.4 |
↓0.87 |
↑1.1 |
↑4.97 |
- |
HRC |
45.62 |
9 |
3.5 |
9 |
2.6 |
8.1 |
143.83 |
24.5 |
Change |
↑5.9 |
↑1.04 |
↑0.5 |
↑1.2 |
↑0.55 |
↑1.2 |
↑26.29 |
↑8.3 |
YoY |
↑9.82 |
↓2.5 |
↓0.3 |
↑2.03 |
↑0.4 |
↑1.1 |
↑15.86 |
- |
CRC |
35.2 |
6 |
2.9 |
2.9 |
0.65 |
4.3 |
58.82 |
15.18 |
Change |
↑1.4 |
↑0.55 |
↑0.3 |
↑0.25 |
↑0.07 |
↑0.85 |
↑4.34 |
↑4.83 |
YoY |
↓11 |
↓0.7 |
↑0.4 |
↓0.08 |
↓0.5 |
↑0.3 |
↓9.61 |
- |
V Maintenance Information
Steel Mill |
Time |
Duration |
Equipment |
Product |
Production Reduction |
Jiangsu Yonggang |
1-Mar |
30 days |
1*120t convertor |
Liquid Steel |
1,000 tons per day |
Jiangsu Xusteel |
11-Feb |
To be confirmed |
1#550m3 BF |
Hot metal |
1,800 tons per day |
Jiangsu Xusteel |
11-Feb |
To be confirmed |
2#550m3 BF |
Hot metal |
1,800 tons per day |
Fujian Sanming Steel |
13-Feb |
To be confirmed |
3#420m3 BF |
Hot metal |
1,400 tons per day |
Xinsanzhou Steel |
15-Feb |
10 days |
2# bar production line |
Rebar |
2,100 tons per day |
Xinsanzhou Steel |
15-Feb |
10 days |
1# bar production line |
Rebar |
2,100 tons per day |
Zenith Steel |
12-Feb |
To be confirmed |
3#850 BF |
Construction Steel |
1,400 tons per day |
Shiheng Special Steel |
Early February |
To be confirmed |
Construction steel production line |
Construction Steel |
1,600 tons per day |
Shandong Guangfu Steel |
1-Feb |
To be confirmed |
1*700m3 BF |
Hot metal |
2,400 tons per day |
Shandong Guangfu Steel |
Early February |
To be confirmed |
All |
Steel |
3,000 tons per day |
Shandong Minyuan Steel |
Early February |
To be confirmed |
1 rebar production line |
Rebar |
2,000 tons per day |
Laiwu Steel |
Early February |
To be confirmed |
Section steel production line |
Section steel |
4,000 tons per day |
Laiwu Steel |
Late February |
10 days |
Section steel production line |
Section steel |
3,000 tons per day |
Magang |
Early February |
To be confirmed |
2 bar production lines; 1* wire rod production line |
Rebar |
8,000 tons per day |
Fujian Sanbao Steel |
Early March |
15 days |
1*1280m3 BF |
Hot metal |
4,200 tons per day |
Shandong Minyuan Steel |
Early February |
To be confirmed |
1*550m3 BF |
Hot metal |
2,000 tons per day |
Fangda Special Steel |
Middle February |
To be confirmed |
1* rebar production line |
Rebar |
4,000 tons per day |
Xinyu Steel |
Late February-Early March |
To be confirmed |
1* rebar production line |
Rebar |
4,500 tons per day |
Xuzhou Dongya Steel |
1-Feb |
To be confirmed |
1*550m3 BF; 1 bar production line |
Hot metal
Rebar |
2,000 tons per day;
3,000 tons per day |
Laiwu Steel |
Early February |
To be confirmed |
1 bar production line |
Rebar |
1,040 tons per day |
Shagang |
13-Feb |
To be confirmed |
2 bar production lines |
Rebar |
5,600 tons per day |
Shandong LaiGang Yongfeng Steel |
Early February |
To be confirmed |
1 bar production line |
Rebar |
2,300 tons per day |
Rizhao Steel |
Middle February |
To be confirmed |
3*wire rod production lines |
Coiled rebar |
6,000 tons per day |
Shandong Steel Yongfeng Steel |
Early February |
To be confirmed |
1 convertor; 1 bar production line |
Rebar |
2,400 tons per day |
Shandong Minyuan Steel |
Early February |
To be confirmed |
1 bar production line |
Rebar |
3,000 tons per day |
Xuzhou Jinhong Steel |
1-Jan |
To be confirmed |
All |
Coiled rebar |
3,000 tons per day |
Jiangyin Changda Steel |
21, Jan |
To be confirmed |
2 bar production lines |
Rebar |
4,000 tons per day |
Anhui Yangtze Steel |
To be confirmed |
To be confirmed |
1 bar production line |
Rebar |
6,700 tons per day |
Magang |
10-Mar |
25 days |
1 bar production line |
Rebar |
3,000 tons per day |
Shandong Chuanyang Steel |
1-Feb |
Late February |
BF; section steel production line |
Section steel |
8,000 tons per day |
Huanghe Special Steel |
25-Feb |
To be confirmed |
1*section steel production line |
Section steel |
700 tons per day |
Xinyu Steel |
15-Feb |
10 days |
1* medium and heavy plate production line |
Medium and heavy plate |
3,500 tons per day |
Danyang Feida Steel |
20-Jan |
To be confirmed |
1*2500mm medium and heavy plate production line |
Medium and heavy plate |
1,500 tons per day |
Jiangyin Changda Steel |
17-Jan |
To be confirmed |
1*2800mmmedium plate production line |
Medium and heavy plate |
4,500 tons per day |
Jiangsu Zhaotai Steel |
15-Jan |
To be confirmed |
1*2500mm medium and heavy plate production line |
Medium and heavy plate |
400 tons per day |
Angang Putian Steel |
4-18 Feb; 1-12 Mar |
26 days |
1 CRC production line |
CRC |
1,900 tons per day |
Wuxi Zhongcai Steel |
18 Jan |
35 days |
1 galvanized sheet and color plating production line |
Galvanized sheet |
1,300 tons per day |
VII Production Resumption
Information
Steel Mills |
Date |
Equipment |
Output |
Yuhua Steel |
10-Feb |
Bar production line (30%) |
1,500 tons per day (Rebar) |
Jiangsu Yonggang |
20-Feb |
1* wire rod production line |
2,300 tons per day (wire rod; coiled rebar) |
Shandong Xiwang Steel |
10-Feb |
3*rebar production lines |
3,000 tons per day (rebar) |
|
(To contact the reporter on this story: nancy.bu@steelhome.cn or 0086-21-50585358 15955340612) |