Search: News Price
Home |  Register |  Price Index  |  Publication |  Consultancy |  Data |  Events |  Enquiry |  Language
Apr.27.2024 1USD=7.1056RMB
  SteelHome >>Steel>>Market Info>>SteelHome Analysis
 
SteelHome Briefing (Feb.24, 2020): Steel Market in East China

https://en.steelhome.com [SteelHome] 2020-02-24 15:05:11

share to social network site

I Steel Market Review and Trading Tips

Review

Most markets in East China have not completely recovered, and some logistics enterprises and construction fields resumed production. Market price inquiry increased and trading volume inclined. Downstream demand gradually was improved. Specifically, construction steel price fell by 70-130 yuan per ton; HRC/CRC price dropped by 20-200 yuan per ton, among which Shanghai HRC price fell at first then rose with plain transaction. Medium plate price declined by 20-110 yuan per ton, except for increased price in Wuan market. Section steel price dropped by 50-90 yuan per ton. Production status of steel mills, market inventory and logistics should be highlighted.

SteelHome predicts that steel price will continue to moderately increase next week.

Forecast

At present, most steel mills in East China reduce or stop production. Besides, downstream enterprises will gradually resume production in this week. And transportation have not completely recovered. Social inventory and inventory in steel mills will continue to increase.

Trading Tips

Traders should stay calm and appropriately sell products to obtain the fund back when the inventory is at a high level. Steel mills are suggested to actively reduce the production.

Construction Steel Price in East China Market

Market

Date

RebarΦ20mm

Medium and Heavy Plate20mm

HRC5.75mm

CRC1.0mm

Angle Steel5#

Shanghai

2020/2/21

3490

3600

3530

4160

3730

Change

↓70

-

↑20

↓110

↓50

Leading Steel Mill/Place of Production

Shente Steel

Pinggang

Rizhao Steel

Wugang

TangshanCai

Zhejiang Hangzhou

2020/2/21

3550

3640

3570

4310

3990

Change

-

↓50

↓30

↓170

↓50

Leading Steel Mill/Place of Production

Shagang

Pinggang

Shagang

Wugang

TangshanCai

Jiangsu Nanjing

2020/2/7

3500

3660

3560

4310

3970

Change

↓80

↓30

↓190

↓110

-

Leading Steel Mill/Place of Production

Yonggang

Pinggang

Magang

Wugang

Anyang

Anhui Hefei

2020/2/21

3610

3620

3610

4300

3870

Change

↓130

↓40

↓160

↓100

↓90

Leading Steel Mill/Place of Production

Magang

Pinggang

Magang

Magang

TangshanCai

Shandong Jinan

2020/2/21

3440

3700

3480

4220

3770

Change

↓110

↑20

↓50

↓90

↓50

Leading Steel Mill/Place of Production

Yongfeng

Tanggang

China Rainway Group

Hangang

Huanghe Special Steel

JiangXi Nanchang

2020/2/21

3600

3730

3650

4290

4000

Change

↓100

↓110

↓200

↓60

↓90

Leading Steel Mill/Place of Production

Nanxin Ping

Pinggang

Xingang

Xingang

TangshanCai

Fujian Fuzhou

2020/2/21

3510

3880

3530

4190

3880

Change

↓100

↓20

-

↓140

↓90

Leading Steel Mill/Place of Production

Sangang

Sangang

Bengang

Bengang

TangshanCai

Average price

2020/2/21

3528

3690

3561

4254

3887

Change

↓84

↓32

↓87

↓111

↓60

II Trading Volume of Main Products in East China

Trading volume of construction steel and flat steel inclined. SteelHome predicts that trading volume will slightly increase in this week.

Trading Volume of Main Products in East China

(Unit: tonne)

Product

Average price

(14-20, Feb)

Change%

Average price

(February)

Change%

Construction steel

220

120

124.99

-99.52

Medium plate

1522

1485.42

650.01

-90.07

HRC

610

263.1

301.45

-93.97

III Price Change of Main Products in East China (Unit: yuan per tonne)

Product

Rebar (Shagang)

Strip (Zenith Steel)

Rebar (Magang)

Rebar (Laiwu Steel Yongfeng Steel)

Rebar (Nanjing Steel)

Medium plate (Huawei)

HRC (Rizhao Steel)

Angle steel (Huanghe special Steel)

Specification

Φ16-25mm

2.5mm*235

Φ16-25mm

Φ18-22mm

Φ16-25mm

14-20mm

4.75mm

100*100

Change

-

↓300

↓80

↓80

↓130

↑20

↓70

↓60

Current Price

3880

3650

3650

3420

3520

3610

3463

3800

Market Price

3550

3670

3610

3440

3520

3620

3530

3770

Difference

-330

20

-40

20

-

10

-67

-30

Leading Market

Hangzhou

Jinan

Hefei

Nanjing

Wuxi

Shanghai

Wuxi

Leading Market

Execution Date

2020/2/21

2020/2/20

2020/2/21

2020/2/21

2020/2/21

2020/2/21

2020/2/18

2020/2/18

Note

Ten-day Price

Daily Price

Daily Price

Daily Price

Daily Price

Post-settlement

Ten-day Price

Listing Price

Review

Strip ex-work price of Zenith Steel declined by 300 yuan per ton (ten-day price); Shagang ex-work price stabilized; daily price fluctuated within 20-130 yuan per ton

Forecast

Daily price will increase in this week while ex-work price (ten-day price) will decline.

IV Inventory

Construction Steel

Review

Demand in East China market have not completely activated and the transportation can not be totally recovered in short time. Construction steel market inventory and inventory in steel mills continued to greatly increase.

Forecast

Market inventory and inventory in steel mills will continue to increase.

Shanghai

Hangzhou

Nanjing

Jinan

Hefei

Nanchang

Fuzhou

Market

Steel Mills in East China

Wire Rod

13.2

26.4

9.7

5.6

8.26

10.5

12.3

123.36

77.12

Change

↑0.9

↑1.2

↑4.5

↑0.7

↑1.76

↑1.3

↑0.5

↑20.46

↑13

YoY

↑7

↑10

↑6.5

↑2.4

↓2.24

↓0.8

↑2

↑48.66

-

Rebar

49.5

64.8

30.3

9.5

35.1

31.8

19

353.7

257.45

Change

↑2.6

↑2.3

↑8.7

↑1.3

↑4.3

↑2.3

↑1

↑43.5

↑40.25

YoY

↑12.5

↑4.1

↑5.2

↑3

↑25.5

↑8.8

↑5

↑135.25

-

Flat Steel

Review

Market inventory and inventory in steel mills continued to increase in East China market, especially HRC inventory.

Forecast

Market inventory and inventory in steel mills will continue to increase as logistics enterprises gradually resume production.

Shanghai

Hangzhou

Nanjing

Wuxi

Jinan

Quanzhou

Steel Market

Steel Mills in East China

Medium and Heavy Plate

17.2

7.5

4.55

8.5

2.13

3.5

69.47

22.28

Change

↑2.1

↑1

↑0.65

↑1.4

↑0.23

↑0.6

↑9.54

↑5.65

YoY

↑0.3

↑1.8

↓1.45

↑3.4

↓0.87

↑1.1

↑4.97

-

HRC

45.62

9

3.5

9

2.6

8.1

143.83

24.5

Change

↑5.9

↑1.04

↑0.5

↑1.2

↑0.55

↑1.2

↑26.29

↑8.3

YoY

↑9.82

↓2.5

↓0.3

↑2.03

↑0.4

↑1.1

↑15.86

-

CRC

35.2

6

2.9

2.9

0.65

4.3

58.82

15.18

Change

↑1.4

↑0.55

↑0.3

↑0.25

↑0.07

↑0.85

↑4.34

↑4.83

YoY

↓11

↓0.7

↑0.4

↓0.08

↓0.5

↑0.3

↓9.61

-

V Maintenance Information

Steel Mill

Time

Duration

Equipment

Product

Production Reduction

Jiangsu Yonggang

1-Mar

30 days

1*120t convertor

Liquid Steel

1,000 tons per day

Jiangsu Xusteel

11-Feb

To be confirmed

1#550m3 BF

Hot metal

1,800 tons per day

Jiangsu Xusteel

11-Feb

To be confirmed

2#550m3 BF

Hot metal

1,800 tons per day

Fujian Sanming Steel

13-Feb

To be confirmed

3#420m3 BF

Hot metal

1,400 tons per day

Xinsanzhou Steel

15-Feb

10 days

2# bar production line

Rebar

2,100 tons per day

Xinsanzhou Steel

15-Feb

10 days

1# bar production line

Rebar

2,100 tons per day

Zenith Steel

12-Feb

To be confirmed

3#850 BF

Construction Steel

1,400 tons per day

Shiheng Special Steel

Early February

To be confirmed

Construction steel production line

Construction Steel

1,600 tons per day

Shandong Guangfu Steel

1-Feb

To be confirmed

1*700m3 BF

Hot metal

2,400 tons per day

Shandong Guangfu Steel

Early February

To be confirmed

All

Steel

3,000 tons per day

Shandong Minyuan Steel

Early February

To be confirmed

1 rebar production line

Rebar

2,000 tons per day

Laiwu Steel

Early February

To be confirmed

Section steel production line

Section steel

4,000 tons per day

Laiwu Steel

Late February

10 days

Section steel production line

Section steel

3,000 tons per day

Magang

Early February

To be confirmed

2 bar production lines; 1* wire rod production line

Rebar

8,000 tons per day

Fujian Sanbao Steel

Early March

15 days

1*1280m3 BF

Hot metal

4,200 tons per day

Shandong Minyuan Steel

Early February

To be confirmed

1*550m3 BF

Hot metal

2,000 tons per day

Fangda Special Steel

Middle February

To be confirmed

1* rebar production line

Rebar

4,000 tons per day

Xinyu Steel

Late February-Early March

To be confirmed

1* rebar production line

Rebar

4,500 tons per day

Xuzhou Dongya Steel

1-Feb

To be confirmed

1*550m3 BF; 1 bar production line

Hot metal

Rebar

2,000 tons per day;

3,000 tons per day

Laiwu Steel

Early February

To be confirmed

1 bar production line

Rebar

1,040 tons per day

Shagang

13-Feb

To be confirmed

2 bar production lines

Rebar

5,600 tons per day

Shandong LaiGang Yongfeng Steel

Early February

To be confirmed

1 bar production line

Rebar

2,300 tons per day

Rizhao Steel

Middle February

To be confirmed

3*wire rod production lines

Coiled rebar

6,000 tons per day

Shandong Steel Yongfeng Steel

Early February

To be confirmed

1 convertor; 1 bar production line

Rebar

2,400 tons per day

Shandong Minyuan Steel

Early February

To be confirmed

1 bar production line

Rebar

3,000 tons per day

Xuzhou Jinhong Steel

1-Jan

To be confirmed

All

Coiled rebar

3,000 tons per day

Jiangyin Changda Steel

21, Jan

To be confirmed

2 bar production lines

Rebar

4,000 tons per day

Anhui Yangtze Steel

To be confirmed

To be confirmed

1 bar production line

Rebar

6,700 tons per day

Magang

10-Mar

25 days

1 bar production line

Rebar

3,000 tons per day

Shandong Chuanyang Steel

1-Feb

Late February

BF; section steel production line

Section steel

8,000 tons per day

Huanghe Special Steel

25-Feb

To be confirmed

1*section steel production line

Section steel

700 tons per day

Xinyu Steel

15-Feb

10 days

1* medium and heavy plate production line

Medium and heavy plate

3,500 tons per day

Danyang Feida Steel

20-Jan

To be confirmed

1*2500mm medium and heavy plate production line

Medium and heavy plate

1,500 tons per day

Jiangyin Changda Steel

17-Jan

To be confirmed

1*2800mmmedium plate production line

Medium and heavy plate

4,500 tons per day

Jiangsu Zhaotai Steel

15-Jan

To be confirmed

1*2500mm medium and heavy plate production line

Medium and heavy plate

400 tons per day

Angang Putian Steel

4-18 Feb; 1-12 Mar

26 days

1 CRC production line

CRC

1,900 tons per day

Wuxi Zhongcai Steel

18 Jan

35 days

1 galvanized sheet and color plating production line

Galvanized sheet

1,300 tons per day

 

VII Production Resumption Information

Steel Mills

Date

Equipment

Output

Yuhua Steel

10-Feb

Bar production line (30%)

1,500 tons per day (Rebar)

Jiangsu Yonggang

20-Feb

1* wire rod production line

2,300 tons per day (wire rod; coiled rebar)

Shandong Xiwang Steel

10-Feb

3*rebar production lines

3,000 tons per day (rebar)


(To contact the reporter on this story: nancy.bu@steelhome.cn or 0086-21-50585358 15955340612)
Related News
上海市通信管理局
沪B2-20040629
Copyright© 2004-. SteelHome.com. All Rights Reserved
Shanghai SteelHome Information Technology Co., Ltd    Tel: +86) 021-50585733, 50585358    Fax: 021-50585277