Search: News Price
Home |  Register |  Price Index  |  Publication |  Consultancy |  Data |  Events |  Enquiry |  Language
Apr.18.2024 1USD=7.102RMB
  SteelHome >>Raw Material>>Market Info>>Special Studies
 
BHP Announces 2019 Q3 Iron Ore Production Report

https://en.steelhome.com [SteelHome] 2019-10-17 11:11:28

share to social network site

Total iron ore production decreased by one per cent to 61 Mt (69 Mt on a 100 per cent basis). Guidance for the 2020 financial year remains unchanged at between 242 and 253 Mt (273 and 286 Mt on a 100 per cent basis).

At WAIO, lower volumes reflected significant planned maintenance at Port Hedland, including a major car dumper maintenance program, to further improve port reliability and provide a stable base for our tightly coupled supply chain. Major planned car dumper maintenance was completed on 16 October 2019, while the port maintenance program continues through the 2020 financial year. Mine operations continued to deliver consistent performance during the quarter.

Mining and processing operations at Samarco remain suspended following the failure of the Fundão tailings dam and Santarém water dam on 5 November 2015.

In September 2019, BHP divested its 45.5 per cent interest in the Nimba iron ore project in Guinea to High Power Exploration Inc. (HPX).

T1: Iron Ore Production Summary

Production

Sep Q19

Sep Q19 vs Sep Q18

Sep Q19 vsJun Q19

FY 20 guidance

Iron ore (Mt)

61

-1%

-3%

242 - 253

WAIO (100% basis) (Mt)

69

0%

-3%

273 - 286

 

T2: Iron Ore Production Summary

Production

Sep Q19

Sep Q19 vs Sep Q18

Sep Q19 vsJun Q19

Iron ore (kt)

61,005

-1%

-3%

 

T3: Iron Ore Production Summary

 

 

Quarterended

Yeartodate

Production(kt)(1)

BHP interest

Sep-18

Dec-18

Mar-19

Jun-19

Sep-19

Sep-19

Sep-18

Newman

85%

16,378

17,578

15,608

17,058

16,316

16,316

16,378

Area C Joint Venture

85%

11,696

10,280

11,627

13,837

12,620

12,620

11,696

Yandi Joint Venture

85%

16,870

15,627

15,214

17,486

17,827

17,827

16,870

Jimblebar

85%

16,353

14,326

13,658

14,209

14,239

14,239

16,353

Wheelarra

85%

114

30

10

5

3

3

114

Samarco

50%

-

-

-

-

-

-

-

Total

 

61,411

57,841

56,117

62,595

61,005

61,005

61,411

Note: (1) Iron ore production is reported on a wet tonnes basis.

T4: Iron Ore Production & Sales

 

Quarter ended

Year to date

Sep 2018

Dec 2018

Mar 2019

Jun 2019

Sep 2019

Sep 2019

Sep 2018

Pilbara, Australia

 

 

 

 

 

 

 

Production(kt)

 

 

 

 

 

 

 

Newman

16,378

17,578

15,608

17,058

16,316

16,316

16,378

Area C Joint Venture

11,696

10,280

11,627

13,837

12,620

12,620

11,696

Yandi Joint Venture

16,870

15,627

15,214

17,486

17,827

17,827

16,870

Area C Joint Venture

16,353

14,326

13,658

14,209

14,239

14,239

16,353

Wheelarra

114

30

10

5

3

3

114

Total production

61,411

57,841

56,117

62,595

61,005

61,005

61,411

Total production (100%)

69,342

65,515

63,609

71,133

69,257

69,257

69,342

 

 

 

 

 

 

 

 

Sales(kt)

 

 

 

 

 

 

 

Lump

15,014

14,020

13,603

15,568

14,785

14,785

15,014

Fines

46,527

44,059

41,981

48,064

45,509

45,509

46,527

Total

61,541

58,079

55,584

63,632

60,294

60,294

61,541

Total sales (100%)

69,421

65,758

62,853

72,173

68,291

68,291

69,421

Samarco, Brazil(kt)

 

 

 

 

 

 

 

Production

-

-

-

-

-

-

-

 

 

 

 

 

 

 

 

Sales

-

10

-

-

-

-

-

Related Link: Official Document


(To contact the reporter on this story: cody.wang@steelhome.cn or 86-555-2238837)
Related News
上海市通信管理局
沪B2-20040629
Copyright© 2004-. SteelHome.com. All Rights Reserved
Shanghai SteelHome Information Technology Co., Ltd    Tel: +86) 021-50585733, 50585358    Fax: 021-50585277